Village District of Eastman

Village District of Eastman
Project Status:Ready to Bid
Project Location:Springfield, New Hampshire
General Bids Due:November 20, 2025 at 3:00 PM
Bid Opening Location:53 Wellfield Rd, Springfield, NH 03284 District Office
Project Owner:Village District of Eastman
Engineer's Estimate:$1,100,000
Description:The major work items for the project include site work, well pump and appurtenances for three existing gravel pack wells, connection of existing wells to new pump station, 1,700 foot long +/- cross country water transmission main, interconnection of transmission main into existing metering building piping, new 12 foot x 24 foot concrete block pump station, associated plumbing, controls, electrical work (including new stand by generator), and other associated work items.
Pre-Bid Conf. Date:1:00 PM October 29, 2025 (Non-mandatory)
Pre-Bid Conf. Location:Village District of Eastman Office at 53 Wellfield Rd
Project Engineer:Mike Duffy
Project Number:221211

Please fill out the following form and a link to the digital specs and plans will be emailed to you.